forked from luck/tmp_suning_uos_patched
0775bc462a
[ Upstream commit d77772538f00b7265deace6e77e555ee18365ad0 ]
During suspend/resume NGD remote instance is power cycled along
with remotely controlled bam dma engine.
So Reset the dma configuration during this suspend resume path
so that we are not dealing with any stale dma setup.
Without this transactions timeout after first suspend resume path.
Fixes:
|
||
---|---|---|
.. | ||
core.c | ||
Kconfig | ||
Makefile | ||
messaging.c | ||
qcom-ctrl.c | ||
qcom-ngd-ctrl.c | ||
sched.c | ||
slimbus.h | ||
stream.c |