It seems commit 4a9d4b024a ("switch fput to task_work_add") re-
introduced the problem addressed in 944be0b224 ("close_files(): add
scheduling point")
If a server process with a lot of files (say 2 million tcp sockets) is
killed, we can spend a lot of time in task_work_run() and trigger a soft
lockup.
Signed-off-by: Eric Dumazet <edumazet@google.com>
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>